-
Jelly roll time
Jelly roll has been on the agenda for a couple weeks now. 🙂 It has been many years since having made one and we didn’t have a recipe.
-
Inaugural firewood run for Sterling.
This morning in the log yard proved that its been cold the last few days.
-
2020 Firewood Year
We’ve been steady through the season selling hardwood and softwood firewood. Along with ourselves, the skid steer and the grapple attachment have been working hard to bring logs to the log deck. We all need a little maintenance now and again, and machines are no exception.
-
257B2 Skid steer undercarriage rebuild
This rebuild started with a simple replacement of the tracks. That is not a simple task either but upon taking the tracks off we discovered a few other issues that needed immediate attention.
-
Harman wood stove fire brick repair.
Have you ever looked into your wood stove and said out loud, “Oh oh!”. Well, I had this bucktoothed stove looking back at me back on the end of November.
-
Slaburday
With our skidsteer still down for track repairs, we have to keep moving with deliveries.
-
Kiln drying firewood in June
Too bad I didn’t figure that out until the drying cycle was over but apparently some saw dust had plugged up the drain line on the kiln’s compressor.
-
Initial test cut of a D&L Timber Tech 180º Swing Blade Saw Mill
Our D&L Timber Tech 180º swing blade saw mill arrived in late March. I think it was March. Anyway, its been a while. Just finding some time to get it set up and now at the stage of fine tuning the kerf cut in vertical and horizontal planes.
-
Mailbox replacement
The snow plow knocked down the mailbox for a final time. It was a brand new metal mail box that we installed for Gina’s mom last year. Flatten more than once, I straightened it each time, only this final time it broke off the flag as well. Time to try something else.
-
Motivation Monday