Bathroom, Renovations Complete bathroom renovation part 3 July 16, 2008 / Floor patch. Removed the tub and framing. Patched the hole where the tub drain went through the floor. Preparing the space for the tub. Finished the day roughing in the framing for the tub and test fitting the space. Framing for the new tub space. Previous | Next