Bathroom,  Renovations

Complete bathroom renovation part 2

New stud wall up.
New stud wall up.

With the new stud wall up, we can see the 24 inches of space that will be gained in the bathroom.

 

 

 

The tub surround and tiles are removed. Water damage was evident around the whole perimeter of the tub.

Tub removal.
Tub removal.

Time for plastering. This is the space where the closet used to be.

Time to get plastered.
Time to get plastered.

Plastering the new wall.

Plaster time.
Plaster time.
Plaster time.
Plaster time.

Previous | Next

A Newfoundland born Canadian with a life long interest in woodworking, baking and anything else that peaks my curiosity.

Leave a Reply

Your email address will not be published. Required fields are marked *