Complete bathroom renovation part 3

Floor patch.
Floor patch.

Removed the tub and framing. Patched the hole where the tub drain went through the floor.

Preparing the space for the tub. Finished the day roughing in the framing for the tub and test fitting the space.

Framing for the new tub space.
Framing for the new tub space.

Previous | Next

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.